Construction of Mekelle Biniam Birhane 2B+G+10 & Adigrat Town Project

Two-level subterranean excavation, heavy retaining civil diaphragm walls, and 10 floors of reinforced concrete frame and finishing works.

Construction of Mekelle Biniam Birhane 2B+G+10 & Adigrat Town Project
Engineering Scope

Detailed Execution Overview

A high-rise commercial engineering landmark in Mekelle, rising 10 elevated stories above ground with two full subterranean basements. The project demanded advanced civil engineering execution, including 8-meter deep perimeter shoring diaphragm walls in dense urban proximity, heavy concrete raft foundations, and an earthquake-resilient concrete moment frame.

Technical Metrics

Project Specifications & Administration

Client / Authority

Municipal / Private Developer

Supervising Consultant

Civil Engineering Directorate

Project Site / Location

Mekelle, Tigray, Ethiopia

Contractor Capacity

Principal High-Rise General Contractor

Key Execution Highlights

  • Deep 2-level basement excavation with zero settlement of adjacent urban structures
  • Towering G+10 reinforced concrete superstructure completed with zero structural defects
  • Landmark commercial presence with integrated elevator and generator infrastructure